“1 into 2” – Whilst working on a simple 8m x 32m structure for the TSS Aquatic Centre, SMSA were also asked to design and install another Aquatic Centre Shade Structure at the other end of the pool at the same time (in a similar but different design). Overall a great project to be involved with as several Olympic and World Champion medallist’s swim there every morning.