Working closely with the Architects and Builders, SMSA were able to design and construct a 500sqm skillion roof covered area, that met with both the Schools wishes and the original Architectural intent. It put us through some challenges with a logistically difficult site, tight time frame and terrible weather, but we won out in the end to the thanks of all involved.