Oxford Falls Grammar – Tension Membrane Covered Walkway
Client:
Oxford Falls Grammar Location:
Oxford Falls - Sydney Australia Job:
Design, engineer and construct and covered waterproof / water tight walkway between 2buildings
The school were looking to cover a new wheel chair access area and stair case to be situated in between 2 existing buildings. The tight area to work within meant most works had to be completed manually with room for only one small access machine. Added to this tight space was that we were unable to attach structurally to the existing building envelope.
The end results were appreciated by all involved.
Village Roadshow Theme Park Green Lantern Ride
Client:
Village Roadshow Theme Parks Location:
Movie World, Gold Coast, Australia Job:
Design and Construct 2 Shade Structures over the walkway for the new Green Lantern ride.
Quickly coming up to the opening date, the client realised that they needed some shade for their patrons urgently. Shade and Membrane Structures was contacted and within a few days the design was completed and agreed to and engineering began.
Overcoming the odds of a quick time frame, Christmas holiday supplier shut down periods, night work, and no availability for motorised access or lifting equipment, the Shade and Membrane Structure team completed the project on time and on budget with a very happy client
Village Roadshow Theme Park Green Lantern Ride
Client:
Village Roadshow Theme Parks Location:
Movie World, Gold Coast, Australia Job:
Design and Construct 2 Shade Structures to protect customers from the harsh sun whilst standing in the overflow area for the new Green Lantern ride.
Soon after opening the ride, the client realised that there wasn’t enough protection from the harsh rays of the sun for their patrons while they waited in line for the new Green Lantern ride at Movie World on the Gold Coast, Australia. They contacted Shade and Membrane Structures Australia to assist them in designing and constructing shade for a difficult area to cover.
Together a design was established, engineering was completed and fabrication began. Before long the job of installation was underway at night and in the rain. The shade structure was completed on time and budget and as the client stated was an “Outstanding Result”.